                                             RIYADH / KING KHALED INTL AIRPORT – (OERK)

RWY 15L/33R & 15R/33L Pavement Maintenance, Airfield Ground Lights Replacement at Western Taxiways/
Aprons Project, and TWY A Resurfacing Project

1 .Introduction:

This AIP supplement provides flight crews, operators, concerned personnel and stakeholders with detailed information and an overview of the operational impact and restrictions resulted from the execution of the maintenance activities on both runways (15L/33R & 15R/33L), TWY A resurfacing project and replacing the airfield ground lights at Western taxiways and aprons.

2 .Timeline and Activation:

The projects will be completed within 23 weeks and have been divided into 15 phases where each phase will be activated and announced through NOTAMs.

Note: Phases 1-5 were executed in advance with its associated NOATM/Publications as the following:
  • Phase 1: Works on TWY H3 intersection TWY H.
  • Phase 2: Works on portion of RWY 15L/33R abeam H1
  • Phase 3: Works on portion of RWY 15L/33R abeam H4
  • Phase 4: Works on:
    • RWY 15L/33R full closure.
    • Portion of TWY H3 between RWY 15L/33R and TWY H.
    • Portion TWY E between TWY N and TWY P)
  • Phase 5: Works on portion of TWY H3 between RWY 15L/33R and TWY H.

3 .Purpose of the Projects:

  • Runways’ pavement maintenance.
  • AGLs upgrading from Halogen to LED.
  • Maintaining Compliant Spacing between AGLs.
  • Installation of LED signages in several locations.
  • Intersection Take off Run Available (TORA) Signage installation.
  • Resurfacing TWY A.
  • Expanding TWY A fillets.

4 .Replacement or Cancellation of the AIP SUP:

The supplement will be replaced if significant change to the published information is expected.

5 .Affected Areas and Operational Restrictions:

 

 

 
Phase 6A
Closed Areas
  • RWY 15R/33L.
  • Portion TWY P from TWY E excluding the intersection to the holding position of RWY 15R/33L through TWY A5.
  • TWY A from TWY A5 including the intersection to the HLDP of RWY 15R.
Duration + 14 Days
Phase Activation NOTAM will be issued to highlight the phase activation.
Operational
Procedures and
Restrictions
TWY T will be the only link between commercial and secondary taxiways.
Associated
Layout
Appendix 1

 

 

 
Phase 6B
Closed Areas
  • TWY P between TWY E excluding the intersection to the Holding position of RWY 15R/33L through TWY A5
  • TWY A from TWY A5 including the intersection to the HLDP of RWY 15R.
Duration + 5 Days
Phase Activation NOTAM will be issued to highlight the phase activation.
Operational
Procedures and
Restrictions

TWY T will be the only link between commercial and secondary taxiways.

RWY 33 in use:
  • Runway (15R/33L) will be used for departures.
  • Runway (15L/33R) will be used for arrivals.

RWY 15 in use:
  • Runway (15R/33L) will be used for arrivals.
  • Runway (15L/33R) will be used for departures.
     
Associated
Layout
Appendix 2

 

 

 

 

 
Phase 7
Closed Areas
  • Portion TWY P between TWY A and TWY E excluding both intersections.
  • TWY A from TWY A5 excluding the intersection to the HLDP of RWY 15R.
Duration + 8 Days
Phase Activation NOTAM will be issued to highlight the phase activation.
Operational
Procedures and
Restrictions

TWY T will be the only link between commercial and secondary taxiways.

RWY 33 in use:
  • Runway (15R/33L) will be used for departures.
  • Runway (15L/33R) will be used for arrivals.
  • The decision to land on RWY 15R/33L will remain available for arriving aircraft at the pilot’s discretion as the LDA will remain the same; however, aircraft must vacate max through TWY A5.

RWY 15 in use:
  • Runway (15R/33L) will be used for arrivals.
  • Runway (15L/33R) will be used for departures.
Associated
Layout
Appendix 3

 

 
Phase 8
Closed
Taxiways /
Aprons
TWY A from TWY A6 excluding the intersection to the HLDP of RWY 15R.
Duration +15 Days
Phase
Activation
NOTAM will be issued to highlight the phase activation.
Operational
Procedures
and
Restrictions

RWY 33 in use:
  • Runway (15R/33L) will be used for departures.
  • Runway (15L/33R) will be used for arrivals.
  • The decision to land on RWY 15R/33L will remain available for arriving aircraft at the pilot’s discretion as the LDA will remain the same; however, aircraft must vacate max through TWY A5.

RWY 15 in use:
  • Runway (15R/33L) will be used for arrivals.
  • Runway (15L/33R) will be used for departures.
Associated
Layout
Appendix 4

 

 

 
Phase 9
Closed
Taxiways /
Aprons
  • Portion TWY T between TWY D excluding the intersection to the HLDP of RWY 33L through TWY A2
  • TWY A from TWY A2 including the intersection to the HLDP of RWY 33L.
Duration + 14 Days
Phase
Activation
NOTAM will be issued to highlight the phase activation.
Operational
Procedures
and
Restrictions

TWY P will be the only link between commercial and secondary taxiways.

RWY 33 in use:
  • Runway (15R/33L) will be used for arrivals.
  • Runway (15L/33R) will be used for departures.

RWY 15 in use:
  • Runway (15R/33L) will be used for departures.
  • Runway (15L/33R) will be used for arrivals.
  • The decision to land on RWY 15R/33L will remain available for arriving aircraft at the pilot’s discretion as the LDA will remain the same; however, aircraft must vacate max through TWY A3.
Associated
Layout
Appendix 5

 

 

 

 
Phase 10
Closed
Taxiways /
Aprons
  • TWY T between TWY D and TWY A excluding both intersections
  • TWY A from TWY A2 excluding the intersection to the HLDP of RWY 33L.
Duration + 10 Days
Phase
Activation
NOTAM will be issued to highlight the phase activation.
Operational
Procedures
and
Restrictions

RWY 33 in use:
  • Runway (15R/33L) will be used for arrivals.
  • Runway (15L/33R) will be used for departures.

RWY 15 in use:
  • Runway (15R/33L) will be used for departures.
  • Runway (15L/33R) will be used for arrivals.
  • The decision to land on RWY 15R/33L will remain available for arriving aircraft at the pilot’s discretion as the LDA will remain the same; however, aircraft must vacate max through TWY A2.
Associated
Layout
Appendix 6

 

 

 

 
Phase 11
Closed
Taxiways /
Aprons

TWY A from TWY A2 excluding the intersection to the HLDP of RWY 33L
Duration + 10 Days
Phase
Activation
NOTAM will be issued to highlight the phase activation.
Operational
Procedures
and
Restrictions

RWY 33 in use:
  • Runway (15R/33L) will be used for arrivals.
  • Runway (15L/33R) will be used for departures.

RWY 15 in use:
  • Runway (15R/33L) will be used for departures.
  • Runway (15L/33R) will be used for arrivals.
  • The decision to land on RWY 15R/33L will remain available for arriving aircraft at the pilot’s discretion as the LDA will remain the same; however, aircraft must vacate max through TWY A2.
Associated
Layout
Appendix 7

 

 

 
Phase 12
Closed
Taxiways /
Aprons
  • Portion TWY A from TWY A5 to TWY A3 excluding both intersections.
  • TWY J
  • APN 7B
  • APN7
  • APN 8 except following stands: 55, G2, and 54
Duration +30 Days
Phase
Activation
NOTAM will be issued to highlight the phase activation.
Operational
Procedures
and
Restrictions
Outbound traffic from stands: 55, G2, and 54 must be pushed facing north to clear TWY Q.
Associated
Layout
Appendix 8

 

 

 
Phase 13
Closed
Taxiways /
Aprons
  • TWY J.
  • APN 7B.
  • APN7.
  • APN 8 except following stands: 55, G2, and 54.
Duration +15 Days
Phase
Activation
NOTAM will be issued to highlight the phase activation.
Operational
Procedures
and
Restrictions
Outbound traffic from stands: 55, G2, and 54 must be pushed facing north to clear TWY Q.
Associated
Layout
Appendix 9

 
Phase 14
Closed
Taxiways /
Aprons
  • Portion TWY A from TWY A2 to TWY A4 excluding both intersections.
  • TWY Q.
  • APN 9B.
  • APN 9.
  • APN 8 except following stands: 50,51,52, G1, and G3.
Duration +30 Days
Phase
Activation
NOTAM will be issued to highlight the phase activation.
Operational
Procedures
and
Restrictions
Outbound traffic from stand G1 must be pushed facing south to clear TWY J.
Associated
Layout
Appendix 10

 
Phase 15
Closed
Taxiways /
Aprons
  • APN 8 except following stands: 50,51,52, G1, and G3
  • TWY Q
  • APN 9B
  • APN 9
Duration +15 Days
Phase
Activation
NOTAM will be issued to highlight the phase activation.
Operational
Procedures
and
Restrictions
Outbound traffic from stand G1 must be pushed facing south to clear TWY J.
Associated
Layout
Appendix 11

 

6 .INQUIRIES:

For any inquiries please contact:
Yousef Ibrahim Alghamdi
Aerodrome Operations Manager
Yighamdi@riyadhairports.com
Tel: 0503300165
Riyadh Airports Company
Abdulaziz Mohammed Alzahrani
Riyadh Tower Chief
abalzahrani@sans.com.sa
Tel: 0502700000
Saudi Air Navigation Services
Aerodrome Operations Duty Manager
aodm@riyadhairports.com
Tel: 0112219479
Riyadh Airports Company
Riyadh Tower Supervisor
Tel: 0112211141
Saudi Air Navigation Services
 

AIP SUP 04/25 hereby replaced

 

-END-

PHASE 6A - Appendix 1

PHASE 6B - Appendix 2

PHASE 7 - Appendix 3

PHASE 8 - Appendix 4

PHASE 9 - Appendix 5

PHASE 10 - Appendix 6

PHASE 11 - Appendix 7

PHASE 12 - Appendix 8

PHASE 13 - Appendix 9

PHASE 14 - Appendix 10

PHASE 15 - Appendix 11